
Lenoir City Streetscape Design Phase 1
Lenoir City is the largest city in Loudon County, and the town continues to thrive and flourish. With this growth, The City of Lenoir City retained Cannon & Cannon to design the first phase for the revitalization of downtown Lenoir City. The project location consisted of work from Kingston Street to A Street. Scope of work for Phase 1 included:
- Design for new pedestrian-friendly sidewalk
- Easily accessible on-street parking with bulb-outs
- New LED street lighting
- Improved drainage for the block of Broadway Street (SR 2) between A Street and Kingston Street
- Utility location
- The bulb-outs in between the on-street parking areas contain space for new street lights, benches and planters
LOCATION
Lenoir City, TN
YEAR OF COMPLETION
2018
MARKETS
Transportation
Services
Engineering Design
Pedestrian Facilities
Permitting
ADA
Field Surveying
Construction Engineering & Inspection (CEI)
Detention & Drainage
Transportation & Traffic
Construction Phase Services
Street Lighting
Utility Location | Relocation